As a baseline is promoted from the lower promotion level to the higher one (from Initial to Built to Tested to Released) can its content be changed? Is it possible to replace a.c,v1 with a.c,v2 within a context of the same baseline?
A: No. Baseline is not modifiable.
No comments:
Post a Comment